Top 10 articles of 2017
More than 1,700 new articles were added to Designing Buildings Wiki in 2017. We've taken a look back and picked out the 10 most highly viewed. Unsurprisingly, Grenfell appears several times.
Fit for purpose - Big data reveals the construction knowledge gap
Designing Buildings Wiki carried out the first ever comprehensive mapping of construction industry knowledge in 2017. The startling results were published in September in a major new report ‘Fit for purpose? Big data reveals the construction knowledge gap’. The report includes a series of remarkable visual maps giving never-before-seen insights into how construction knowledge works and where it fails.
Aluminium Composite Material (ACM) panels became notorious following the Grenfell Tower fire on 14 June 2017, when ACM cladding with a polyethylene core was thought to have contributed to the rapid spread of the fire up the outside of the tower.
Roofs can be constructed from a wide variety of materials and in a wide variety of shapes depending on the requirements they have to satisfy, the local climate, the availability of materials and skills, the span to be covered, and so on.
On 14 June 2017, a fire broke out in Grenfell Tower, a block of social housing flats in North Kensington occupied by between 400 and 600 people. The fire was reported shortly after midnight and rapidly engulfed the building, resulting in the deaths of 71 people.
Trench fill foundations are a type of shallow foundation that avoids bricklaying below ground by instead almost completely filling a trench excavation with concrete. This type of foundation minimises the excavation required, as bricklayers are not required to access the trench to lay bricks or blocks.
Celotex RS5000 is a type of thermal insulation designed for use in rainscreen cladding systems. It forms a layer of thermal insulation between the rainscreen and the inner part of the wall construction. Celotex RS5000 was used as the insulation for the Grenfell Tower refurbishment.
Line of balance (LOB) is a management control process used in construction where the project contains blocks of repetitive work activities, such as roads, pipelines, tunnels, railways and high-rise buildings. LOB collects, measures and presents information relating to time, cost and completion, and presents it against a specific plan.
The term ‘flooring’ refers to the lower enclosing surface of spaces within buildings. This may be part of the floor structure, such as the upper surface of a concrete slab or floor boards, but typically it is a permanent covering laid over the floor.
The Government acted to support owners and residents of high-rise buildings to ensure fire safety in the light of the Grenfell Tower fire. Initial tests were conducted at BRE on behalf of the Department for Communities and Local Government (DCLG) to identify which cladding systems were of concern.
Tomorrow's challenges in today's buildings
In October, Designing Buildings Wiki and BSRIA launched an ideas competition asking; how can buildings be designed today to ensure they are resilient to the changes they will face tomorrow? Entrants proposed a wide range of solutions, including; bomb-proof construction, using ocean waste to make building materials, using rooftops for food production, electrifying the entire construction industry, and many, many more…
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
New Prime Minister delivers on ECA call for cut in electricity costs.
CIOB reacts to the announcement of Andy Burnham as Prime Minister.
Heritage and conservation science workforce survey - Have your say.
England's Suburbs 1820-2020. Book review.
New, more proportionate and targeted approach for higher-risk building assessments.
Government brings British Steel into public ownership.
UKCW Birmingham returns with bold new theme and focus.
New guidance published on competence requirements for self-certification schemes.
Construction Management, 8 July
NEETs crisis drives interest in trades, but apprenticeships barriers remain.
Passive fire protection webinar
MEP services penetration seals.
Where its at podcast (and video) - The role of the Architectural Technologist as an Expert Witness.
More than 200 remarkable buildings added to SAVE’s Buildings at Risk register.



























